Commissioning & Installation
As part of our service portfolio we can offer our clients assistance during commissioning, hookup and installation. After a completed Factory Acceptance Test (FAT) at our manufacturing site we can further extend our services to Extended FAT (EFAT)?and Site Integration Test (SIT) together with our clients. Having built the systems we are the natural choice to assist during extensive testing and installation. Hitec Products has qualified and competent service engineers who, within a short mobilization time, can assist in commission and installation in most parts of the world.
Our facilities have the space for multiple systems to be tested simultaneously.